Hai RuisiAir tightness detectorMethod and process for testing micro motor sealing test and IPX7 waterproof test level
micro motorAir tightness test
1.Testing requirements
A. The complete motor reachesIPX7 waterproof testgrade
B. Pressure or vacuum the inside of the motor from the motor shaft.
C. Leakage is allowed at the wire terminal area.
D. Convenient to take and place.
2. Difficulties in testing
A. The wire terminal part and the air inlet part of the motor shaft must be in the same pressure environment or both parts must have air inlet at the same time.
B. Sealing wire material.
3. Product diagram

4. Schematic diagram of sealing test mold

5. Key points for air tightness testing. The motor shaft and wire terminals must enter air at the same time.
6. Overall IPX7 waterproof testing tooling diagram


7. Introduction to the test sequence and methods of IPX7 waterproof test level:
1. Manually install the motor to be tested into the product positioning seat, and install the wire terminal part into the terminal holder.
2. Start with both hands, press down the two cylinders, and seal the motor shaft and terminals at the same time.
3. The instrument starts to supply air in equal amounts and at equal pressure. (At the same time, it supplies air to the two molds of the motor shaft and wire terminal)
4. After inflation and pressure stabilization, the instrument will calculate and analyze whether the pressure of the injected gas has dropped.
5. Under the premise of confirming that the mold does not leak, if the pressure decreases, it means that the product does not meet the sealing requirements. On the contrary, it means that the product can meet the sealing requirements.
6. According to the IPX7 level requirements, a detection pressure of approximately 10.5-11KPA will be used for testing.
-
2026.11.13Hirays Completes Delivery of a Major RGA Project for a Leading New Energy Customer
-
2026.11.13Hirays Named a National-Level "Little Giant" Enterprise
-
2026.11.13Media Coverage | Precision Testing Sector Gains Fresh Capital Backing: Hirays Technology Completes Series B Financing
-
2026.11.06Joining Forces, Starting Anew, Winning the Future Together | HIRAYS Marks 18 Years with a Team-Building Journey in Qingyuan
-
2026.11.06HIRAYS Shares RGA Quadrupole Mass Spectrometry Leak-Detection Expertise at CQC Compliance Training in Shenzhen
-
2026.11.06Leaders of CQC Shenzhen Branch Visit HIRAYS for Inspection and Guidance, Discuss Quality Improvement and Technological Innovation
-
2026.11.04The Full Hirays HM Mass Spectrometry Portfolio in One Place: One-Stop Protection for High-End Precision Manufacturing
-
2026.11.04HM-230 RGA: In-Situ Gas Monitoring Across Multiple Pressure Regimes
-
2026.11.04A New Frontline Defense for Line Yield: Hirays' HM-150 RGA Stands Up to Harsh Process Conditions to Protect Every Wafer



