In the company, there are always moments when we can truly feel the extraordinary power of ordinary positions.
Recently, four colleagues including Li Gong, Senior Engineer, Ran Gong, and Pan Gong from the Organization and Delivery Department formed a project attack team. They worked hard day and night for five days and taught us a vivid lesson.
When the order was received, there were only 5 days left before delivery.
A few days ago, a project at a large factory in Zhejiang suddenly started: the customer's timetable for the goods was tight and the delivery must be completed within 5 days, and the process standards could not be lowered at all. More importantly, the progress of this project will directly affect the connection of several subsequent large projects of the company.
If it were anyone else, they might have given up immediately, but the four members of the attack team did not hesitate at all and took over the task on the spot."Don't talk about conditions, win the project first, deliver it on time and with quality, and don't let the company suffer." They were determined, rolled up their sleeves, and got to work.

Working hard day and night, the "race" in the factory
From the moment they received the mission, the rhythm of the four members of the team automatically switched to "double speed mode."During the day, the factory workshop is full of them, either carefully checking the dense parameters, or coordinating and communicating among various departments, testing adjustments and optimizing plans over and over again, checking lists and counting equipment parts over and over again, for fear of missing any detail.
They don’t have a fixed lunch break, and they often remember they haven’t eaten lunch until the restaurant is closed; they no longer think about what time to get off work, and start racing against time to advance core work at 6 or 7 in the morning. They are still working overtime to solve problems at 11 o’clock in the middle of the night, and sometimes they can’t even squeeze in a drink of water.
They walked with wind in their eyes and used every minute on the edge, for fear of slowing down the progress of the project.

A decisive battle until the last moment
The test really comes the day before the project is delivered, because the equipment delivered to the customer must not have any quality problems, otherwise all the efforts will be wasted.Therefore, in order to ensure that all links were flawless, the team decided to go through all the processes and key nodes again. They took the instrument instructions and operation flow charts, carefully checked and tested the entire process. Every link was improved without any negligence.

When all the indicators pointed to "passed", the four people looked at each other and smiled, with tired faces but unable to hide their excitement.At that moment, all the hard work turned into solidity and satisfaction.
Efficient delivery, responsible and promising
In the end, the project was successfully delivered on time, with high quality and quantity, which not only won high recognition from customers, but also helped the company to secure key nodes and ensure the smooth advancement of subsequent key projects.Their outstanding contributions have been recognized and rewarded by the company.

In this tough battle, the four colleagues did not perform any earth-shattering feats, but only persevered and dedicated day after day.With their professionalism, responsibility and collaboration, they interpreted the hard-working spirit of Hairuisi people to be "reliable, able to withstand and win at critical moments". They also used practical actions to practice Hairuisi's core values of "seeking truth from facts, overcoming difficulties and making progress, pursuing excellence, integrity, focus and sharing".
They are the pride of the team and the benchmark of Hai Ruisi!
Concentrate your efforts and work hard!In the future, Hairuis will continue to uphold the mission of "continuously creating value for customers with professional technology", forge ahead through hard work, and contribute more to the upgrading of China's intelligent manufacturing industry!
-
2026.03.30Commemorating the revolutionary martyrs and inheriting the red spirit | Record of hirays’s theme activity of walking to commemorate the martyrs’ cemetery
-
2026.03.20Starting from June, the sale of non-compliant power banks will be banned: many companies ignore this detection issue
-
2026.03.16After charging 70% in 5 minutes, how can the safety of the power battery be maintained?
-
2026.03.14Overcoming difficulties and showing responsibility, efficient delivery wins praise - a tribute to the four pioneer employees on the production front line
-
2026.03.03Comparison of mass spectrometry technology applications: How do Heris helium mass spectrometers and RGA series enable precision manufacturing?
-
2026.02.26Construction has started | hirays starts a new journey of struggle in 2026
-
2026.02.06Let’s work together to embark on a new journey | The 3rd hirays Fun Games was successfully held
-
2026.02.05Riding horses side by side, working together to move forward | hirays year-end ceremony and awards ceremony concluded successfully
-
2026.02.05How does a smart watch pass the waterproof level?In-depth analysis of hiraysi’s full-link air-tightness detection solution
